Please ensure Javascript is enabled for purposes of website accessibility

Lot #320
Jim McDivitt's Apollo 9 Flown Schematic

Schematic for CSM Fuel Cell 1—a point of failure on Apollo 13—flown on the Apollo 9 LM ‘Spider’

This lot has closed

Estimate: $1000+
Sell a Similar Item?
Refer Collections and Get Paid
Share:  

Description

Schematic for CSM Fuel Cell 1—a point of failure on Apollo 13—flown on the Apollo 9 LM ‘Spider’

Flown Apollo 9 CSM overview schematic for the fuel cell/cryogenic system, 22 x 10.5, vertically signed and flight-certified in the left margin in green felt tip, "'Flown on Apollo 9,' Jim McDivitt." The schematic bears an affixed tab to the right side, "FC/Cryo," and diagrams the connections and pathways for Fuel Cell 1, as well as general hardware locations within the Command Module to the upper left. In fine condition. Accompanied by a signed letter of provenance from McDivitt, in part: "This CSM Fuel Cell/Cryogenic schematic was flown on Apollo 9 in March, 1969, aboard the LM-3 moon lander 'Spider,' flying for the first time...This schematic is part of a book of schematics of all CSM and LM systems, which was kept in the lander in case of a system failure, for diagnosis and/or repair. This item is from my personal collection." The fuel cells and cryogenic oxygen tanks are the systems that would later catastrophically fail during Apollo 13, and Fuel Cell 1 in particular was a key point of failure. A superb example of a page from an early flown Apollo manual.

Auction Info

  • Auction Title: Fine Autographs And Artifacts
  • Dates: #493 - Ended February 08, 2017





This item is Pre-Certified by STEVE ZARELLI
Buy a third-party letter of authenticity for $100.00

*This item has been pre-certified by a trusted third-party authentication service, and by placing a bid on this item, you agree to accept the opinion of this authentication service. If you wish to have an opinion rendered by a different authenticator of your choosing, you must do so prior to your placing of any bid. RR Auction is not responsible for differing opinions submitted 30 days after the date of the sale.