Please ensure Javascript is enabled for purposes of website accessibility

Lot #9232
Apollo 7 and 9 Processing Schedules

Apollo 7 and 9 Processing Schedules

This lot has closed

Estimate: $0+
Sell a Similar Item?
Refer Collections and Get Paid
Share:  

Description

Apollo 7 and 9 Processing Schedules

Two folders featuring work schedule criteria for the Apollo 7 and Apollo 9 missions. First, the Apollo 7 folder, labeled “CSM 101,” contains nine unbound pages to the Apollo 7 Mission Operation Report packet, two of which unfold into detailed tracking and landing charts; a collection of 22 sheets denoting two week work schedules, each 11 x 8.5, listing task, area or vehicle, authorization, and time frame, dated between April and September 1968, the majority annotated and marked in an unknown hand; three gridded sheets filled out in pencil, 11 x 8.5, indicating multi-week work schedules for the SLA–5; and an issue of NASA’s Spaceport News, Vol. 7, No. 20, dated September 26, 1968. Second, the Apollo 9 folder, labeled “CSM 104, LM 3,” contains comprehensive checkout history charts for LM-3, page 3/4, extending from June 1968 to March 1969, and CSM-104, page 1/2, extending from October 1968 to May 1969, both measuring 17 x 11. Punch and staple holes, light creasing, and expected storage folds, otherwise overall fine condition.

Auction Info

  • Auction Title: Space and Aviation Auction
  • Dates: #463 - Ended October 22, 2015